Return to mwra.com home

Massachusetts Water Resources Authority
PROJECT UPDATE

Date:

Updated April 27, 2021

Contact:

Jeffrey McLaughlin
(617) 305-5762, Jeffrey.McLaughlin@mwra.com


Update for MWRA Southern Extra High Pipeline Project,
Dedham North (MWRA Contracts 7504 and 7505)

overview of work area

Overview of work to be performed in Dedham under MWRA Contract 7504

About this Project:

This project will provide water service redundancy for Boston, Canton, Norwood, Stoughton, and Dedham‐Westwood, through construction of a redundant pipeline. The project will also increase distribution storage within the service area to improve system operation and reliability. Work will include the construction of a pipeline from the Bellevue storage tank to East Street in Westwood.

Contract 2 of the Southern Extra High pipeline project has started. The contractor, P. Gioioso and Sons, has completed their first phases of work which involved the protection and wrapping of trees along the pipeline alignment.  Other trees have been marked and removed along Dedham Blvd and further along the alignment. The first phase of pipe work involves the installation of a new drainage line along with the primary focus of installing the new 36” water line.  This work began in the area of Emmett Avenue to just beyond Charity Lane.  Once the drain line has been installed the contractor will go back and begin to install the new 36” water line within Dedham Blvd. from the Boston line and head in the direction of Emmett Avenue.  This work will be continuous with traffic detours in place on a daily basis. Traffic detours are described below.

traffic

Traffic Impacts:

Dedham Blvd will be closed in both directions from Sawmill Lane to Alwin St. except for abutters.  Southbound will be detoured at Alwin St to Turtle Pond Parkway onto River St.  Northbound will be detoured onto Milton St. to River St and Turtle Pond Parkway.

Walnut Street will be closed in both directions from Whiting Avenue to Milton Street.  The detour will utilize Whiting Avenue, River Street and Milton Street.

The contractor plans on utilizing a second crew and they will begin on Walnut Street at Oakdale Avenue heading South towards Mt. Vernon Street.  This crew plans to begin the 36 inch water pipeline installation work on Monday, March 5, 2018.  Residents in this area will begin to see preliminary work involving surveys, test borings and pits, tree protection, and the installation of the 36” pipe.   All roads where the new pipe is installed will be paved from curb to curb at the end of this contract.  This contract (two) is scheduled to be complete by the end of 2019.

MWRA has developed a notification system for communicating information to residents regarding construction projects, community meetings and more.  Once you sign up you will receive periodic updates on the progress of the construction project, as well as traffic detour updates.  We encourage all residents to sign up at http://www.mwra.com/updates/everbridge/join.html.  This construction project is named the Southern Extra High Pipeline - Section 111 (Dedham North), Contract 7504.  

This contract (“Contract 2”) is scheduled to be complete by the end of 2019.

For more information, please call Jeff McLaughlin at MWRA at (617)305-5762 or by email at Jeffrey.McLaughlin@mwra.com.

Project Updates

April 27, 2021

Sign up for electronic project notifications and updates through our Everbridge service.

7505 - SEH (Dedham South, CP-3) Remaining Work

  • Walkthrough of cut-in valves
  • Finishing up final paving
  • Roadway striping and traffic loops
  • Tree Plantings

Road restoration

Road restoration

Sidewalk and easement restoration

Cutting in traffic loops at Harvard Street intersection

March 31, 2021

Sign up for electronic project notifications and updates through our Everbridge service.

7505 - SEH (Dedham South, CP-3) Remaining Work

  • Walkthrough of cut-in valves
  • Restoration of cut-in valves, East Street & a small piece of Allied Drive
  • Tree Plantings

March 2, 2021

Sign up for electronic project notifications and updates through our Everbridge service.

Recently Completed- Contract 7505

  • Completion of cut-in valves at Meter 188
  • Re-activation of Section 77

Remaining Work:

  • Walkthrough of cut-in valves
  • Restoration of cut-in valves, East Street and a small piece of Allied drive

February 3, 2021

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7505

Installed Isolation Valves at Meter 330 on East Street and Harvard Street

Meter 330 Isolation valve on Harvard Street

Section 77 exposed on Washington Street at Meter 188

Installing 36" Butterfly Valve at Meter 188

Completing Mainline work - 36" x6" Steel tee with Gate Valves, 36" Butterfly Valve and 36" Dresser Coupling for isolation valve work in Washington Street

Coupon from Section 77 at Meter 188 Steel Pipe

Coupon from Section 77 at Meter 188 Steel Pipe

December 14, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7505

Section 111 Activated and Supplying Southern Extra High Communities

Intermediate TAP - Section 111 Connection to Section 77 Tapping Sleeve Positioned and Outer Concrete Removed

Tapping Sleeve and Inner Gland Installed

Tapping Machine Installed

Connecting 24" DI Pipe between Section 11 and Section 77 at Station 1+6 (East Street & Jefferson Street)

Restoration of East Rotary - Overlay

Painting

October 29, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7505

Allied Drive passed pressure test

Disinfection

Installing 30" GV on Tapping Sleeve

Tapping equipment being lowered into excavation

Restoration on Rustcraft Road (adjusting cases)

Base and Top Coat of Paving Installation on Rustcraft Road

Installing Air Vent Piping

October 29, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

Planting Trees on Mount Vernon

New Trees on Dedham Boulevard

Leveling of lip on Bridge walkway

Crosswalk Imprinting Repair at Milton Street

October 2, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7505

Remaining Work:

  • Pressure test of MBTA Crossing & up to Allied Drive
  • Tapping Section 77 at Rotary (Steel Pipe) & Connection
  • Disinfection of entire Section 111
  • Tapping of Section 77 on East Street (PCCP Pipe) & Connection
  • Installation of Valves at Meters 188 (Boston) & 330 (Dedham)
  • Restoration

Completion of Jacking Pit and Recieving Pit at the MBTA Crossing

Lowering 1st piece of pipe and installing the auger

Installing the Casing Pipe

Steel Casing Pipe installed through the secant piles at the receiving pit

Instaling Steel Carrier Pipe

Installing and Welding Steel Carrier Pipe

Installing bends in Jacking and Receiving Pits (after grouting)

Began Restoration on Rustcraft Road

Welding of Tapping Sleeve onto Section 77

Pressure Test on Allied Drive

October 2, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

Work Update:

  • Resolve bridge sidewalk leveling
  • Tree Planting
  • Loam and seed entrance to abandoned railway (near high school)

Repairing Sidewalks on Jefferson Street

Repairing Sidewalks on Jefferson Street

Installing Traffic Loops

Pavement Painting on Walnut Street and Milton Street

Installing Cementitious Base at Milton Street Inlaid Crosswalk

Painting and Removing taped group pattern

Crosswalk imprinting at Milton Street

Mother Brook Bridge - Planters (by Town)

Mother Brook Bridge - Rail prep for painting on opposite side

June 16, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

Work Update:

  • Town completed Walnut Street curbs and sidewalks
  • Paving Overlay
  • Paint Existing Bridge Rail
  • Resolve bridge sidewalk leveling
  • Tree Planting
  • Loam and seed entrance to abandoned railway

Permanent Trench Paving on upper Dedham Boulevard

Milling on Dedham Boulevard

Milling on Milton Street

Milling on Walnut Street

Loaming & Seeding and Swale, Dedham Boulevard

June 16, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7505

Remaining Work:

  • MBTA Crossing
  • Pressure test of MBTA Crossing & up to Allied Drive
  • Tapping Section 77 at Rotary (Steel Pipe) & Connection
  • Installation of Valves at Meters 188 (Boston) & 330 (Dedham)
  • Restoration

Installing bend and thrust block at bend as pipe enters MBTA Easement at the end of Allied Drive

Installed piles for the jacking pit at the MBTA Crossing

Installed Well Points for the dewatering systems at MBTA Crossing

Auger drilling for secant piles and pouring piles at the Receiving pit at the MBTA

Auger drilling for secant piles and pouring piles at the Receiving pit at the MBTA

Loaming the Route 95 lay down at the Crossing

April 27, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7505

Installed 36" and 14" Pipe Inside 66" Casing PIpe on I-95

Pumping Grout and close up of Bulkhead at I-95 Crossing

Welding 36" Steel Pipe at Station 68+88 at the I-95 Crossing

Installed Steel to Ductile Transition Coupling at East Side of I-95 Crossing

Installed Steel Pipe at the Slopesat I-95 Crossing

Installed Steel Pipe up the slopes at I-95 Crossing

Installed 36 " Ductile pipe at the end of Allied Drive heading towards MBTA Crossing

Rail Supports at MBTA Crossing

April 27, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

Work Update:

  • Complete installation of curbs and sidewalks
  • Town to complete Walnut Street curbs and sidewalks
  • Complete handicap railings
  • Paving overlay
  • Paint existing bridge rail

Sidewalks and Handicap Ramp on Dedham Boulevard

New Curbing and Concrete Sidewalks on Milton Street

Mother Brook Bridge

Closeup of bench on Mother Brook bridge and work progress

April 7, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7505

Work Progress:

  • Three crews installing pipe on lower Rustcraft Road and on either side of the Route 95 crossing.

Upcoming Work:

  • Install pipe across both sides of the Route 95 rotary, MBTA Crossing; pressure test on lower Rustcraft Road; and Section 77 tapping at Rotary.

Tunnel Face

The contractor broke into the receiving pit on I-95.

February 27, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

Work Update:

  • Walk through of project complete.

Upcoming Work:

  • Start installation of curbs and sidewalk, prepare for tree planting and paving overlay in the spring.

Walk through - Entry at Air Valve

Construction Update - Contract 7505

Work Progress: 90% of pipeline installed

Upcoming Work: Pipe jacking

Jacking reached retrieval pit on Northbound side of Route 95

Grouting

Preparing to install carrier pipes

Test Pit at Section 77 in Westwood at Rotary

February 11, 2020

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

Work Update:

  • All Southern Extra High contracts now in service.

Upcoming Work:

  • Paving to resume in the Spring.
Project photo

Mother Brook Bridge

Project photo

Mother Brook Bridge

Project Photo

Road Restoration

Construction Update - Contract 7505

Work Update:

  • Pipeline now in service.

Upcoming Work:

  • Paving to resume in the Spring.
Project photo

Construction on jacking pit

Project Photo

Safety walkthrough with local Fire Departments

Project Photo

First piece of permalok pipe ready for jacking

Project Photo

6-foot diameter manhole installed for upconing connection to Section 77

November 4, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

Upcoming Work:

  • Bridge Work
  • Paving starting now and to be complete in the Spring
project photo

Pipeline Disinfection Complete

project photo

Eversource installing gas main on Dedham Blvd.

project photo

Road Restoration on Mount Vernon Street

project photo

Jefferson Street base course installed

Construction Update - Contract 7505

Project photo

Pipe installation on Rustcraft Road

project photo

MassDot traffic control set up

project photo

Drain work on Rustcraft Road

Installation of 36” ductile iron pipe on Rustcraft Road

October 8, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

project photo

Pipeline disinfection complete

project photo
project photo

Concrete pour at Mother Brook Bridge

project photo

Hatches at Mother Brook Bridge

Upcoming Work:

Bridge work - ongoing.

 

Construction Update - Contract 7505

Work Progress

Paving – start now, complete in Spring.

project photo

Installation of 36-inch ductile iron pipe on Rustcraft Road

project photo

36-inch pipe on Rustcraft Road

project photo

Vertical bends on Rustcraft Road

project photo

Drain work on Rustcraft Road

September 12, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update - Contract 7504

project photo

Concrete pour at Mother Brook Bridge

Concrete at Mother Brook Bridge

Concrete at Mother Brook Bridge

Test of disinfection equipment

Construction Update - Contract 7505

project photo

Installation of 36-inch ductile iron pipe on Rustcroft Road

project photo

36-inch ductile iron pipe on Rustcraft Road

project photo

Excavation on Lower Rustcraft Road

project photo

Horizontal gate valve

project photo

Service replacements

project photo

Allied Drive installed up to rotary

August 7, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Work Update, contract 7504:

progress photo

Thrust block on East side of Mother Brook Bridge

progress photo

Demolition at Mother Brook Bridge

progress photo

Demolition at Mother Brook Bridge

progress photo

Transition coupling installation

Work Update, contract 7505:

progress photo

Installation of 36" ductile iron pipe under DI culvert and plastic drain on Rustcraft Road

progress photo

Catch basin on Rustcraft Road

progress photo

Installation of DWWD 12' main on Rustcraft Road

June 4, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Work Update, contract 7504:

  • Pipe installed and 100% complete

Connecting ductile to steel on west side of Mother Brook Bridge

Steel pipe at east side of Mother Brook Bridge Crossing

Prepping for deck at Mother Brook Bridge

Restoration of drainage swale at Walnut Street Bridge

Work Update, contract 7505:

  • Installing pipe on Rustcraft Road
  • Installing pipe on Allied Drive
progress photo

Crane at East Street rotary for valve vault installation

progress photo

MWRA gate valve vault at East Street rotary (end of Allied Drive near Rte 95)

progress photo

Working on Allied Drive

progress photo

Installing Pipe on Rustcraft Road

June 4, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Work Update, contract 7504:

  • Ductile pipe almost complete
  • Pressure testing to be completed

Steel pipe being set at Walnut Street Bridge Crossing

Steel pipe being installed

Installing vent pipe at Walnut Street Bridge

Temporary paving on Walnut Street and Mt. Vernon

Work Update, contract 7505:

  • Completed DWWD main on lower portion of Rustcraft Road
  • Completed MWRA valve vault near East Street
project photo

DWWD main being installed

project photo

MWRA gate valve vault

project photo

Began installing MWRA 36-inch pipe on Rustcraft Road

May 3, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Work Update, contract 7504:

construction photo

Steel pipe set up at Walnut Street Bridge crossing

construction photo

Supporting pole at Walnut Street Bridge

construction photo

Mother Brook Bridge: crane set up

construction photo

Steel beam installation

Work Update, contract 7505:

Dedham Westwood Water District 12-inch pipe installation

Prepping for installation of MWRA gate valve vault

 

April 8, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Work Update, contract 7504:

  • Erosion control installed
  • Tree protection being installed
  • Starting pipe work in April
  • Traffic message boards will be in place at both ends of work
progress image 1

Erosion control in place

progress image 2

Portable message signs in place at both ends of work

March 11, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Work Update, contract 7504:
Progress of pipe installed: 99% complete

Valve vault at Walnut Street Bridge

Mother Brook - West Abutment

January 30, 2019

Sign up for electronic project notifications and updates through our Everbridge service.

Work Update, contract 7504:
Progress of pipe installed: 93% complete.

Progress Photos, contract 7504:

Progress photo

Piple installation on Walnut Street

Progress photo

Pipe installation at Jefferson Street and Mt. Vernon

Progress photo

Pouring the East abutment footing

Progress photo

Prepping the West abutment footing

Work Update, contract 7505:

  • Submittal
  • Consultant evaluating jack and bore method preferred by MBTA
  • Revising sequencing to compensate for revised MBTA crossing
  • The plan is to start pipe installation in the Spring
  • Dedham now has a sewer rehab project on Rustcraft Road - coordination is ongoing.

December 1, 2018

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Update for Southern Extra High Project, Dedham North (MWRA Contract 7504)

Notice: Existing bridge to be shut down for 2-3 days in February for crane setup for steel installation.

progress photo
progress photo

Construction progress

progress photo

Pipe installation in Milton Street

progress photo

Utilities and rock

progress photo

Pipe installation on Jefferson Street

progress photo

Pipe installation on Jefferson Street

Construction Update for Southern Extra High Project, Contract 7505

Work update:

  • Consultant borings at MBTA Crossing completed evaluating jack and bore method preferred by MBTA.
  • Dedham/Westwood main on Rustcraft will begin in the Spring.

progress photo

Drilling for soil characterization

progress photo

MBTA Dedham Corporate Station Crossing

Sign up for electronic project notifications and updates through our Everbridge service.

November 1, 2018

Sign up for electronic project notifications and updates through our Everbridge service.

Progress Photos - 7504

pipe installation

Pipe installation on Mount Vernon

blow off manhole

Blow-off manhole on Sawmill Lane

thrust block

Thrust block formed for bend in Milton Street

gate valve

Gate valve installed on Jefferson Street

Work Update - 7505

  • Pre-drilling starts in November
  • Consultant borings started at MBTA Crossing

Progress Photos - 7505

dedham crossing

MBTA Dedham Corporate Station Crossing

October 1, 2018

Sign up for electronic project notifications and updates through our Everbridge service.

Work Update - Contract 7504

  • Project 46% complete
  • Progress of pipe installed: 67% complete

Progress Photo

 

Installing pipe on Mount Vernon

Installing air valve manhole Mount Vernon

Progress Photos - Contract 7505

MBTA Dedham Corprate Station crossing

May 4, 2018

Sign up for electronic project notifications and updates through our Everbridge service.

Progress Photos

Installing pipe on Mt. Vernon Street

Pipe on Mount Vernon Street

Pipe on Mount Vernon Street

Installing pipe and manholes on Mount Vernon Street

Installing pipe and manholes on Mount Vernon Street

Installing pipe on Dedham Boulevard

Installing pipe on Dedham Boulevard

Installing pipe on Dedham Boulevard

Installing pipe on Dedham Boulevard

May 4, 2018

Sign up for electronic project notifications and updates through our Everbridge service.

Progress Photos

pipe installation

Pipe being installed under existing utilities on Walnut Street

pipe and bend

Pipe and bend installed on Walnut Street

rock removal

Rock removal on Dedham Parkway

Rock removal

Rock removal

May 4, 2018

Sign up for electronic project notifications and updates through our Everbridge service.

Construction Photos

24-inch REP drain installation on Dedham Boulevard

Pipe installation on Walnut Street

April 11, 2018

Construction Photos

Construction photo April 11 2018
Construction photo April 11 2018

Installation of 24-inch drain on Dedham Boulevard

Construction photo April 11 2018

Ledge removal on Dedham Boulevard

Construction photo April 11 2018
Construction photo April 11 2018

Pipe installation on Walnut Street

Construction photo April 11 2018
Construction photo April 11 2018

Air valve manhole on Walnut Street

March 6, 2018

Construction Update

Second work crew on Walnut Street started on Monday, March 5.

Upcoming work:

Installing drain on Dedham Boulevard

Sign up for electronic project notifications and updates through our Everbridge service.

photo 1 030618

24-inch RCP drain installation on Dedham Boulevard

photo 2 030618

Setting drain manholes on Dedham Boulevard

photo 3 030618

Ledge removal on Dedham Boulevard

photo 4 030618

Ledge removal on Dedham Boulevard

photo 5 030618

Pipeline laid out on Mount Vernon

February 13, 2018

Construction Update

The contractor has started the installation of the DCR 24-inch drain on Dedham boulevard.  They have also been working on sewer inspection and rehabilitation, pre-drilling for ledge removal and tree trimming/removal along the pipeline route.  The Contractor had planned to have a second crew working on Walnut Street in January, but this has been pushed back to late February at the earliest.

erosion control

Erosion control installed

pre drilling

Pre-drilling for rock on Dedham Boulevard

RCP drain

24-inch RCP drain being installed on Dedham Blvd.

hoe ramming rock

Hoe ramming rock

tree removal

Tree removal on Dedham Blvd

tv inspection

TV inspection of existing sewers is ongoing

Sign up for electronic project notifications and updates through our Everbridge service.

Contact

For more information, please contact Jeff McLaughlin at (617) 305-5762.

Back to top


Follow us

twitter icon
flickr
YouTube button
Sign Up for Everbridge Notifications from MWRA