Return to mwra.com home

Massachusetts Water Resources Authority
PRESS RELEASE

Posted:

October 6, 2021

Contact:

Olivia Dorrance, 617-626-4967, Olivia.K.Dorrance@mass.gov


DCR Issues Reservoir Advisory: Framingham Reservoir No. 1 (Stearns Reservoir)

Beginning this week, (October 4, 2021 through October 10, 2021) and continuing for approximately four to six weeks, the Department of Conservation and Recreation (DCR) and the Massachusetts Water Resources Authority (MWRA) will commence a drawdown of Framingham Reservoir No. 1 (Stearns Reservoir) in the City of Framingham to accommodate work on a new operations and emergency-use only boat ramp located at Salem End Road. This will result in a significant drop in the water levels of the reservoir for an extended period of time. While the exact duration of the drawdown is contingent on rainfall events, the drawdown and lowered water levels are expected to last until early to mid-November.

Original DCR Press Release

###


Follow us

twitter icon
flickr
YouTube button
Sign Up for Everbridge Notifications from MWRA

Back to top

Posted October 7, 2021